NOKREK INFRA
The GSM Construction Advantage
Delivering reliable infrastructure through government contract expertise, technical excellence, rural development initiatives, and a long-term commitment to quality construction across the Garo Hills region.
Government Contract Expertise
With over two decades of experience executing government-awarded contracts, we bring proven project management capabilities and a deep understanding of public infrastructure requirements.
Rural Infrastructure Development
Our work is focused where it matters most — bringing durable, well-built infrastructure to rural communities across East and South Garo Hills that drives real and lasting change.
Technical and Functional Precision
We bridge the gap between engineering expertise and on-ground execution, ensuring every structure we build meets the highest standards of safety, strength, and longevity.
Long-Term Reliability
Our projects are not built for the short term. Every construction we deliver is designed to stand the test of time, reflecting our belief that quality infrastructure is the foundation of regional progress.
Delivering Impact Through Every Contract
At M/s George S Marak Construction, we do not just complete projects — we build foundations for communities to grow on. Our work across Meghalaya stands as a testament to what disciplined, ethics-driven construction can achieve.
Strategic Government Partnerships
We have a strong and consistent track record of executing rural infrastructure projects awarded through government contracts, maintaining full compliance, transparency, and accountability at every stage.
Community-Centred Approach
Every road, structure, and facility we build directly improves the lives of the people around it. We take that responsibility seriously and carry it into every decision we make on site.
Experienced Workforce
Our construction teams are skilled, trained, and deeply familiar with the terrain and requirements of Northeast India — bringing both technical capability and regional understanding to every project.
Ethical Construction Practices
We operate with complete transparency in our project execution, material sourcing, and compliance reporting — ensuring that every rupee of public investment translates into genuine, lasting infrastructure.
| SL NO | DESCRIPTION OF WORK | CLIENT |
|---|---|---|
| 1 | Construction of approaches to Simsang Bridges at Williamnagar (Job No. PW/WR/2005-2006/334)-Construction of approaches on Williamnagar Bank from Chainage 0.00- 153.66m and from Chainage 172.00-456.00m and construction of R/wall thereof. |
Public Work Department (PWD) Roads |
| 2 | "Construction including MBT of road from T-03 (Rongmil) to Gabil Patal (7.42Km) Ph V" under package No. MG/01/08 |
Public Work Department (PWD) Roads |
| 3 | Improvement of a road including Metalling and Blacktopping 4th & 5th Km of Rongjeng - Jambal Road (L-2Km) under Special Plan Fund (Job No. PW/WR/2015-2016/219). |
Public Work Department (PWD) Roads |
| 4 | Construction of retaining Wall in the approaches to the major Bridge over river Simsang (Stone masonry wall including pucca side drain Ch. 120.00m to 150.00m (both sides) and Ch.170.00 to 230.00m (both sides). |
Public Work Department (PWD) Roads |
| 5 | Construction including M&BT of a road from T04 to samin Chaining (L-6.056 km) Stage I & II (Batch 1) MG/01/05/03-04/1 |
Public Work Department (PWD) Roads |
| 6 | Construction including M&BT of a road from Chagreng to Sisobibra (Nengmandaigre to Gildokgre) L-7.82Km i/e 2Nos of bridge stage I & 11:2018-19 (Batch IV) under world Banking funding package |
Public Work Department (PWD) Roads |
| 7 | Improvement and Widening of Rongreggre Simsangre Nengkra (RSN) Road (22.00Km) (Portion from 10th Km to 16th Km-7Km) under RIDF- |
Department (PWD) Roads |
| 8 | Construction of Submersible Vented Pipe Causeway over Kampil River at Samda (Length -45.00 m) (Job No.PW/WR/2021-2022/41). |
Department (PWD) Roads |
Production Infrastructure & Capacity
50+ Retail Shops